Boggs v. Ohio Dept. of Transp., (Ohio 2011)

Ohio Supreme Court

Linked as:

Summary


Automobile damage, pothole. Site of damage-causing event not within maintenance jurisdiction of defendant. Case dismissed.

Summary


Automobile damage, pothole. Site of damage-causing event not within maintenance jurisdiction of defendant. Case dismissed.

Text




[Cite as Boggs v. Ohio Dept. of Transp., 2011-Ohio-2491.]

  Court of Claims of Ohio  The Ohio Judicial Center   65 South Front Street, Third Floor  Columbus, OH 43215  614.387.9800 or 1.800.824.8263  www.cco.state.oh.us        CHRISTOPHER J. BOGGS              Plaintiff              v.    OHIO DEPARTMENT OF TRANSPORTATION              Defendant        Case No. 2010-08471-AD    Clerk Miles C. Durfey    MEMORANDUM DECISION      {¶ 1}  Plaintiff, Christopher J. Boggs, filed this action against defendant  contending that his 2000 Mazda MPV van was damaged as a proximate cause of  negligence on the part of ODOT in maintaining a hazardous condition on Interstate 75  North in Dayton.  Specifically, plaintiff noted that two tires on his van were destroyed  when the vehicle struck a pothole, which he located “on I-75 North at the 3rd Street  exit.”  Glenda F. Boggs, a passenger in the van at the time of the damage incident,  provided a written narrative of her recollection of the event.  Glenda Boggs wrote:  “we  were traveling slowly in the fast lane on I 75 N headed for the Dayton International  Airport when we struck an 8 inch deep pothole in the vicinity of the Third Street exit  ramp.”  Plaintiff recalled that the described damage event occurred on March 26, 2010  at approximately 4:10 a.m.  In his complaint, plaintiff provided a copy of an “Information  Report” compiled by City of Dayton Police Officer, John C. Jezioro, who investigated  and chronicled the damage incident forming the basis of this claim.  Jezioro, in the  “Information Report,” provided a location for the particular damage-causing pothole “in  the fast lane on I 75 Northbound approximately 100 yards south of the Third Street exit.”   Also, Jezioro advised that the size of the pothole was “12 inches by 12 inches in 

- 1 -

  diameter and was jagged and at least three inches deep.”  According to Jezioro,  “Dayton Police Dispatch was contacted and was informed to immediately have street  maintenance come out to this location and repair this major hazard.”  Jezioro related  that, “[s]treet maintenance arrived on scene and repaired the pothole and then the  scene was cleared by all crews.”  When plaintiff attempted to satisfy his property  damage claim with the City of Dayton, he was informed that the site of his damage  incident was located within an ODOT construction project area under the control of  ODOT contractor, Ruhlin Construction Company (Ruhlin).  Plaintiff filed this complaint  against defendant seeking to recover $523.43, the cost of replacement parts, towing  costs, and related repair expenses he incurred as a result of the March 26, 2010  incident.  The filing fee was paid.  {¶ 2}  Defendant explained that the location of plaintiff’s damage occurrence was  near a working construction project area under the control of ODOT contractor, Ruhlin,  but that the precise location of the particular pothole on Interstate 75 North was within  the maintenance jurisdiction of the City of Dayton.  Defendant specifically denied that  ODOT is responsible for maintenance of Interstate 75 North at the Third Street Exit in  Dayton.  Defendant advised ODOT and the City of Dayton entered into a contractual  agreement (copy submitted) whereby the City of Dayton agreed to provide maintenance  services for the section of Interstate 75 where plaintiff’s incident occurred.  Defendant  pointed out that the “Information Report” compiled by City of Dayton Police Officer, John  C. Jeziror, wrote City of Dayton personnel were dispatched to the pothole site on  Interstate 75 on March 26, 2010 and repaired the defect.  Defendant related that “the  project limits for the Ruhlin Construction Company (Interstate 75 North) is from  mileposts 11.01 to 12.23.”  According to defendant, the approximate “area that plaintiff  hit the pothole is at milepost 12.49.”  Defendant provided a map of Interstate 75 North  showing the construction project area and the general location of plaintiff’s incident.   This evidence shows that plaintiff’s incident was located outside the construction project  limits and within the area under the maintenance jurisdiction of the City of Dayton.   Other evidence provided, particularly the report from Officer Jezioro locates the  damage-causing pothole outside the construction project zone.  Defendant submitted a  transcript of an interview with plaintiff’s son, Dustin Boggs, who was driving plaintiff’s  van at the time of the March 26, 2010 property damage event.  During the course of the   

- 2 -

  interview, Dustin Boggs located the pothole before the construction site.  From all  evidence submitted, the trier of fact finds that the location of the damage-causing  pothole was not on a roadway area maintained by either ODOT or Ruhlin.  The site of  the incident was located within the City of Dayton and shown to be the maintenance  responsibility of that political subdivision.  {¶ 3}  R.C. 2743.01(A) provides:  {¶ 4}  “(A) ‘State’ means the state of Ohio, including, but not limited to, the  general assembly, the supreme court, the offices of all elected state officers, and all  departments, boards, offices, commissions, agencies, institutions, and other  instrumentalities of the state.  ‘State’ does not include political subdivisions.”   {¶ 5}  R.C. 2743.02(A)(1) states in pertinent part:  {¶ 6}  “(A)(1) The state hereby waives its immunity from liability, except as  provided for the office of the state fire marshal in division (G)(1) of section 9.60 and  division (B) of section 3737.221 of the Revised Code and subject to division (H) of this  section, and consents to be sued, and have its liability determined, in the court of claims  created in this chapter in accordance with the same rules of law applicable to suits  between private parties, except that the determination of liability is subject to the  limitations set forth in this chapter and, in the case of state universities or colleges, in  section 3345.40 of the Revised Code, and except as provided in division (A)(2) or (3) of  this section.  To the extent that the state has previously consented to be sued, this  chapter has no applicability.”  {¶ 7}  Ohio Revised Code Section 5501.31 in pertinent part states:  {¶ 8}  “Except in the case of maintaining, repairing, erecting traffic signs on, or  pavement marking of state highways within villages, which is mandatory as required by  section 5521.01 of the Revised Code, and except as provided in section 5501.49 of the  Revised Code, no duty of constructing, reconstructing, widening, resurfacing,  maintaining, or repairing state highways within municipal corporations, or the bridges  and culverts thereon, shall attach to or rest upon the director, but he may construct,  reconstruct, widen, resurface, maintain, and repair the same with or without the  cooperation of any municipal corporation, or with or without the cooperation of boards of  county commissioners upon each municipal corporation consenting thereto.”   {¶ 9} The site of the damage-causing incident was not the maintenance   

- 3 -

  jurisdiction of defendant.  Consequently, plaintiff’s case is dismissed.  See Sandu v.  Ohio Dept. of Transp., Ct. of Cl. No. 2008-02606-AD, 2008-Ohio-6858.                            Court of Claims of Ohio  The Ohio Judicial Center   65 South Front Street, Third Floor  Columbus, OH 43215  614.387.9800 or 1.800.824.8263  www.cco.state.oh.us        CHRISTOPHER J. BOGGS              Plaintiff              v.    OHIO DEPARTMENT OF TRANSPORTATION              Defendant        Case No. 2010-08471-AD    Clerk Miles C. Durfey                ENTRY OF ADMINISTRATIVE DETERMINATION          Having considered all the evidence in the claim file and, for the reasons set forth  in the memorandum decision filed concurrently herewith, this case is DISMISSED.   Court costs are assessed against plaintiff.                       

____________________

          MILES  C.  DURFEY          Clerk   

- 4 -

    Entry cc:    Christopher J. Boggs    Jerry Wray, Director      1052 Avery Drive    Department of Transportation  Bowling Green, Ohio  43402    1980 West Broad Street          Columbus,  Ohio    43223  RDK/laa  1/26  Filed 2/24/11  Sent to S.C. reporter 5/16/11       

- 5 -

Sponsored links




ver las páginas en versión mobile | web

ver las páginas en versión mobile | web

© Copyright 2012, vLex. All Rights Reserved.

Contents in vLex United States

Explore vLex

For Professionals

For Partners

Company